Bathroom Renovations
Before renovations:
- Bathroom was stripped out and we plugged off pipework. Water and waste pipes were altered and new pipework rerun where necessary.
- Alan from Newline Industries custom made the shower base.
- Geoff from Glass Trends custom made and installed the glass shower surround.
- Carl from Prestige Installations waterproofed and laid floor to ceiling tiles.
- Working in with Ross Lee Gasfitter a new Rinnai Gas Infinity was installed removing the old hot water cylinder and new pipework was run.
- Gary from Davison Electrical installed the individual DC Short heated towel rail bars, each had to be wired individually, he also replaced old wiring, replaced old lights with new down lights etc.
After renovations:
- After completion from the above Companies we fitted off new plumbing fixtures, installed were:
- Slide Shower – Methven Tahi Satinjet Shower System
- Shower Mixer – Methven Tahi Thermostatic Dual Flow Mixer
- Shower walls – a white glass finish
- Basin – St Michel – Dark Oak
- Basin Mixer – Methven Kiri Basin Mixer
- Wall Cupboard – St Michel – Dark Oak
- Heated Towel Rail – DC Short Individual Heated Towel Rail
- The vanity is “Michel Cesar” – “Area” in gloss white.
- Mirrors – custom made by Glass Trends