Plumbing
on February 9th, 2012
Work in progress
Bathroom renovations
Before renovations:
Bathroom was stripped out and we plugged off pipework. Water and waste pipes were altered and new pipework rerun where necessary.
Alan from Newline Industries custom made the shower base.
Geoff from Glass Trends custom made and installed the glass shower surround.
Carl from Prestige Installations waterproofed and laid floor to ceiling tiles.
Working in with Ross Lee Gasfitter a new Rinnai Gas Infinity was installed removing the old hot water cylinder and new pipework was run.
Gary from Davison Electrical installed the individual DC Short heated towel rail bars, each had to be wired individually, he also replaced old wiring, replaced old lights with new down lights etc.
After renovations:
After completion from the above Companies we fitted off new plumbing fixtures, installed were:
Slide Shower – Methven Tahi Satinjet Shower System
Shower Mixer – Methven Tahi Thermostatic Dual Flow Mixer
Shower walls – a white glass finish
Basin – St Michel – Dark Oak
Basin Mixer – Methven Kiri Basin Mixer
Wall Cupboard – St Michel – Dark Oak
Heated Towel Rail – DC Short Individual Heated Towel Rail
The vanity is "Michel Cesar" – "Area" in gloss white.
Mirrors – custom made by Glass Trends